ZYTEK   CHALLENGE

  1. Find  a  paraffin  dispersant  and  inhibitor  that  is  environmentally  safe  and  user  friendly.

  2. Find one that works at 175 ppm.

  3. That  will  inhibit  and  disperse   91%  of  paraffin  depositions  or  restrictions  in  all  phases  of  oil  production, as long as our consultation and recommendations are followed.

  4. Is as cost effective and easy to apply.

   We  would  like  to  challenge  anyone  in  the  oil  industry,  with  a  paraffin  problem,  to  try   ZYTEK  on  a  NO  FIX   NO  PAY  BASIS.   We  have  so  much  faith  in  our  product   we  will  consult  with  you  and  decide  what  type  of  treatment  you  need  and  how  much  chemical  will  be  required  based  on  your  * run  ticket, * flow  charts  or * other  information  you  provide.  At  that  time  we  will present  you  with  an  invoice  for  one  days  consultation  fee,  daily  per diem,  and  cost  of chemical. We  will  agree  with you on  a  definition  of  your problems  and  our  goals.  We will then treat your problem.  After   treatment  we  will  require  run  tickets,  flow charts,   or  other  information  needed  at  that  time  to  show  that  we  have met  our  goals.  That’s when you pay our invoice.  The proof will be undeniable.

* INFORMATION NEEDED

  1. FOR  TANK  APPLICATION  –  We   will  require  a  run  ticket  showing  the  API  gravity of  crude oil,   amount  of  BS&W  suspended   in  crude  oil,  as  well  as  the  amount  of  BS&W  standing  in the  bottom  of  the  tank,  also  size  of  tank  and  amount  of  crude  in  tank.  Since  circulation  of crude  and  chemical  is  necessary,  adequate  methods  of  agitation  will  be  required.  (ZYTEK   IS A MOTION ACTIVATED CHEMICAL THEREFORE AGITATION IS NECESSARY).
     

  2. FOR  DOWN  HOLE  –  We  will  need  to  know  the  API  gravity  of  your  crude,  depth  of  the well,   size  of  casing,  tubing,  and  sucker  rods.  We  will  need  to  know  how  much  crude  and water  is  being  produced  in  a  24  hour  period  and  how  much  crude  you  want  treated  in  the  formation. (Well  will  need  to  be  re-circulated   for 72  hours  to  allow   ZYTEK   to  wash  the well bore,  casing,  perforations,  tubing,  and  sucker  rods  clean,  therefore  creating  better production).
     

  3. FOR  FLOW  LINES / PRODUCTION  LINES  -  We  will  need  to  know  API  gravity  of  all  crude  oil   being  passed  through  the  flow  line  being  treated,  size  of  the  flow  line  (O.D. & I.D.), flow  charts  showing  the  amount  of  crude  flowing   through  the  line  at  this  time  and estimated  amount  of  build-up  inside  the  line.





 

All Rights Reserved. © 2011/2012 ZyTek International Inc.
Designed and hosted by A cup of the Net